PLC Control Air Shower Tunnel With Conveyor Roller Line

PLC Control Air Shower Tunnel With Conveyor Roller Line

Product Details:
Place of Origin: China
Certification: CE
Payment & Shipping Terms:
Minimum Order Quantity: 1sets
Price: USD3000-8000
Packaging Details: polywood packing
Delivery Time: 15 working days
Supply Ability: 10set/ month

  • Description
  • Inquiry

PLC Control Air Shower Tunnel With Conveyor Roller Line

Detail

External size :  2110x2380x2400mm

Internal size : 1460x1650x1900mm

Material:   External is steel with power coated internal is stainless steel 304

Both side with Auto Roller  Door

air speed: more than 24m/s

Control system : PLC control system

Compact product : Auto Conveyor Line

 

 

The follow draw illustration :

 

1: Roll door mechanism

2: Air shower nozzle

3: HEPA air filter

4: per-filter

5:  blowing

6: control box for the roll door

7: purification light

PLC Control Air Shower Tunnel With Conveyor Roller Line

PLC Control Air Shower Tunnel With Conveyor Roller Line

Control program:  The pallet pass box line can be working in both direction whenever it is. .

It can put out full pallet and then put only one empty pallet

 

From clean room to dirty room:

 

A working press the button1, the D1 will be open,

He left the pallet with finished goods on the conveyor and push the button 1 again for the D1 closed. (the D1 can’t close if the sensor 1 not detected any thing).

After D1 closed completely, the D2 open, meanwhile the conveyor1 and conveyor2 move the pallet goods out of the pass box until the sensor 2 detected the pallet the conveyor stop working. The door2 closed.

Note: worker take off the pallets from conveyor 2, then the sensor 2 can’t detect anything, during this time, if someone press the button1 or 2, there is no any respond.

 

From dirty room to clean room:

 

A worker left the empty pallet on the conveyor, he press the button2, the D2 will be open and the conveyor will be take the empty pallet to the inside of pass box, when the sensor 3 detects the pallet, the conveyor stop move, the D2 closed and the self-clean system blowing 15s with ionized air .15s later the D1 open automatic.

Note:  worker take off the pallets from convyor1, then the sensor1 or3 can’t detect anything, during this time, if someone press the button1 or 2, there is no any respond,

until the door 1 closed , the new cycle will be start again.

 

Note:  1: The PLC control system not including the touchable screen.

2: the button1 or button 2 can fix at any place that you wanted

1: Document :

  A: Document for custom clear: 1 sets

B: Assemble draw : 1 pcs

C: Circuit diagram draw: 1 pcs

D: Test report : 1sets

E: Additional IQ/OQ/PQ document is available upon request.

 

2: Extra Free Spare Part so that you can replacement in future by yourself :

HEPA air filter +Pre-filter : 1 sets for air shower pass box

Note: HEPA air filter should be replacement in half and one year.

Pre-filter should be replacement in each 6 months, but it can refresh no more than 3 times

3: Delivery time: 25 working days after we get the deposit.

4: Payment term: 30 T/T in advance, 70% before shipment.

5: The guarantee time is one year excluding consumable parts and Accessories.

6: The price validity time is 30days.

Contact Us






Online Service
Live Chat